All Tags » Agile » Agile Reporting
  • How To: Emailing the Sprint Burndown report

    The Scrum for Team System process template includes reports to help manage the progress of project.  The onus is on the team to run - by opening them - and review them.  This is the default behaviour of the Team Foundation Server which our process template built against, however as the Team Foundation Server platform uses SQL Server ...
    Posted to Steve Wright's Blog (Weblog) by steve.wright on January 22, 2010
  • My Adventures in Codeplex

    In October 2009 I created 2 codeplex projects which I would to tell you about: SQL Server Reporting Services MSBuild Tasks (ssrsmsbuildtasks) A few years ago I created some tasks for MSBuild to help deploy reports for my project, details can be found here,  since then my tasks have been re-used in a few other projects within my ...
    Posted to Steve Wright's Blog (Weblog) by steve.wright on December 9, 2009
  • SfTS V3 Beta 2:Helping to see the wood for the trees

    Within any application lifetime management methodology, the reports are a useful tool to help see how well , or not , the project is progressing.  Within the Scrum methodology the reports which are used for tracking progress are the burndown reports.  In the Scrum for Team Systems process templates for Team Foundation Server these ...
    Posted to Steve Wright's Blog (Weblog) by steve.wright on December 7, 2009
  • SfTS V3: The Beta 1 reports new comers

    As mentioned in my previous blog post, there are some new reports available in the Scrum for Team System V3 Beta 1 Template. I would like to give a high level overview of the new reports as there will be full report guidance available with the template explaining in more detail how to use the reports. The new Diagnostic report isn’t really a new ...
    Posted to Steve Wright's Blog (Weblog) by steve.wright on August 3, 2009
  • SfTS V3 Operation: Reports face lift.

    For the last few months I, with the help of fellow work colleague Kate Begley, have been working on the writing the reports for the Scrum for Team System V3 process template, which Beta 1 has been released and details are available from http://blogs.conchango.com/sfts/archive/2009/07/28/scrum-for-team-system-v3-beta-programme.aspx. There are a ...
    Posted to Steve Wright's Blog (Weblog) by steve.wright on July 29, 2009
  • Reporting Services 2008 Report automatic upgrade gotcha.

    For the Scrum for Team System project I have been focusing on the reports; I came across an issue which was due to the way the Reporting Services 2008 ''automatic upgrade'' feature upgraded our reports. The Scrum for Team System template contains over 20 reports all written for Reporting Services 2005. This was done because Team Foundation Server ...
    Posted to Steve Wright's Blog (Weblog) by steve.wright on March 30, 2009
  • Scrum for Team System Version 2.2 support for SQL Server 2008

    As I have mention in a previous blog entry I’ve been heavily involved in the Scrum for Team System process template since the start of version 2 and have written the majority of the reports. I have faced, and still do, some challenges while doing this. Some of them have been around how to display the data within reporting services 2005. ...
    Posted to Steve Wright's Blog (Weblog) by steve.wright on October 16, 2008
  • The Scrum for Team System report slide show tool

    As I have mention in another blog posts; I’ve been heavily involved in the Scrum for Team System process template since the start of version 2 and to coincide with the release of version 2.2; I would like bring your attention to a new tool, which I help to developed, that has been added to this release. I started creating this tool due to ...
    Posted to Steve Wright's Blog (Weblog) by steve.wright on October 16, 2008
  • Build Reports added to Scrum for Team System v2.2

    Continuing from my previous posted. I’d like to give an overview to the new engineering practices reports included in the Release 2.2. Builds Across a user selected time period (defaulting to the current sprint), this report shows the total builds per day broken down by status. Build Static Analysis and Compile This displays ...
    Posted to Steve Wright's Blog (Weblog) by steve.wright on October 14, 2008
  • New Reporting Features available in Scrum for Team System v2.2

    To coincide with the release of version 2.2 of Scrum for Team System, I’d like to bring your attention to the wide range of new reports included in this release. I’ve been heavily involved in the Scrum for Team System process template since the start of version 2 and have written the majority of the new reports and tweaked some of the old ones to ...
    Posted to Steve Wright's Blog (Weblog) by steve.wright on October 14, 2008